Verification by tests of models proposed for synchronous machines, excitation control systems, water supply and turbines and its control systems for colbún and machicura power plants
In this paper several models proposed for Excitation Control Systems, Synchronous Machines, Prime Movers Control System and Turbines corresponding to the Hydraulic power plants of Colbún and Machicura are shown and verified. These power plants are located in the “Interconnected Central System” (SIC...
Autores principales: | , , , |
---|---|
Formato: | Objeto de conferencia |
Lenguaje: | Español |
Publicado: |
2005
|
Materias: | |
Acceso en línea: | http://sedici.unlp.edu.ar/handle/10915/36734 |
Aporte de: |
id |
I19-R120-10915-36734 |
---|---|
record_format |
dspace |
institution |
Universidad Nacional de La Plata |
institution_str |
I-19 |
repository_str |
R-120 |
collection |
SEDICI (UNLP) |
language |
Español |
topic |
Ingeniería Energía Eléctrica power system stabilizer control systems excitation systems governors hydraulic turbines limiters modelings |
spellingShingle |
Ingeniería Energía Eléctrica power system stabilizer control systems excitation systems governors hydraulic turbines limiters modelings Agüero, Jorge Luis Bastidas Almarza, L. Beroqui, Mario César Fuentes Bomvin, S. Verification by tests of models proposed for synchronous machines, excitation control systems, water supply and turbines and its control systems for colbún and machicura power plants |
topic_facet |
Ingeniería Energía Eléctrica power system stabilizer control systems excitation systems governors hydraulic turbines limiters modelings |
description |
In this paper several models proposed for Excitation Control Systems, Synchronous Machines, Prime Movers Control System and Turbines corresponding to the Hydraulic power plants of Colbún and Machicura are shown and verified.
These power plants are located in the “Interconnected Central System” (SIC), Chile’s largest grid and are part of the Colbún subsystem. This grid subsystem also bears industrial load. It supplies energy to “El Teniente” -world’s largest copper mineand to several paper manufacturing plants.
The models were used to study the Colbún subsystem under island operation when the SIC blacks out due to under-frequency conditions. |
format |
Objeto de conferencia Objeto de conferencia |
author |
Agüero, Jorge Luis Bastidas Almarza, L. Beroqui, Mario César Fuentes Bomvin, S. |
author_facet |
Agüero, Jorge Luis Bastidas Almarza, L. Beroqui, Mario César Fuentes Bomvin, S. |
author_sort |
Agüero, Jorge Luis |
title |
Verification by tests of models proposed for synchronous machines, excitation control systems, water supply and turbines and its control systems for colbún and machicura power plants |
title_short |
Verification by tests of models proposed for synchronous machines, excitation control systems, water supply and turbines and its control systems for colbún and machicura power plants |
title_full |
Verification by tests of models proposed for synchronous machines, excitation control systems, water supply and turbines and its control systems for colbún and machicura power plants |
title_fullStr |
Verification by tests of models proposed for synchronous machines, excitation control systems, water supply and turbines and its control systems for colbún and machicura power plants |
title_full_unstemmed |
Verification by tests of models proposed for synchronous machines, excitation control systems, water supply and turbines and its control systems for colbún and machicura power plants |
title_sort |
verification by tests of models proposed for synchronous machines, excitation control systems, water supply and turbines and its control systems for colbún and machicura power plants |
publishDate |
2005 |
url |
http://sedici.unlp.edu.ar/handle/10915/36734 |
work_keys_str_mv |
AT aguerojorgeluis verificationbytestsofmodelsproposedforsynchronousmachinesexcitationcontrolsystemswatersupplyandturbinesanditscontrolsystemsforcolbunandmachicurapowerplants AT bastidasalmarzal verificationbytestsofmodelsproposedforsynchronousmachinesexcitationcontrolsystemswatersupplyandturbinesanditscontrolsystemsforcolbunandmachicurapowerplants AT beroquimariocesar verificationbytestsofmodelsproposedforsynchronousmachinesexcitationcontrolsystemswatersupplyandturbinesanditscontrolsystemsforcolbunandmachicurapowerplants AT fuentesbomvins verificationbytestsofmodelsproposedforsynchronousmachinesexcitationcontrolsystemswatersupplyandturbinesanditscontrolsystemsforcolbunandmachicurapowerplants |
bdutipo_str |
Repositorios |
_version_ |
1764820472038424580 |